3 mai 2024-France-Bouygues Travaux Publics
Design Coordinator/Engineer H/F
Bouygues Travaux Publics is seeking a VIE to work for a new metro line 430 metres long, 20 metres wide and 25 metres deep. The station is being built using the "Top Down" construction method, incorporating diaphragm walls and permanent slabs. The project also includes the construction of two 7-metre diameter, 770-metre long tunnels. Other key structures in the project include a launch shaft, an au ...Afficher plus